Showing posts with label flooring replacement. Show all posts
Showing posts with label flooring replacement. Show all posts

Tuesday, 19 April 2016

Life Doesn't Have to be Perfect #10

I had a very productive weekend stitching-wise. Very happy with my progress.

Our floors have all been replaced and it is all finished - last night was the first night in my own bed for a week, and it was lovely!
Happy Stitching,
Kerrie

Friday, 15 April 2016

Life Doesn't Have to be Perfect #9


Working my way around the border on the other side now, and I'm happy with my progress.

Our flooring is almost done thank goodness - just the beading around the edges to be done now and then the removalists come back on Monday to put all our stuff back into place. I sure will be glad when it's all done.

We're heading off to Aireys Inlet tonight for a couple of days of doing nothing which will be very welcome! I'm planning on several naps in the afternoon! 
Have a great weekend everyone!
Happy Stitching,
Kerrie

Thursday, 14 April 2016

Life Doesn't Have to be Perfect #8

Started on the border out to the left side last night.
I got a better night's sleep last night with my own pillow. The flooring is making good progress. The old stuff all got ripped up yesterday and the guy is staying back today to get as much of the new floors put down so tomorrow can be a short day. Bring on the weekend! We are hoping to go to Aireys so it will be nice to get away from it all, even for a day or two.
Happy Stitching,
Kerrie


Wednesday, 13 April 2016

Life Doesn't Have to be Perfect... #7

I'm working my way around the border...
I'm exhausted with waiting for tradespeople for our flooring replacement. Yesterday was one of my long days at work and then we had to go back and forth between our house and our temporary accommodation to feed Clarence. This morning, I was up at 6am and ready to meet the flooring removal guy at 7am. Of course, 2 nights without much sleep and a really dodgy pillow at the temporary accommodation, mean I'm not feeling too bright today! I've packed my pillow today so hopefully I'll get a good night's sleep before having to get up at 6am again tomorrow to let the floor guy into the house again. I sure will be glad when it's all done!
One good thing about the flooring replacement (due to the washing machine that got stuck on the fill cycle in January) is that we found another problem behind a small bar fridge which had been leaking and really damaged the floors more than the washing machine leak. So it's a good thing all the timber floors are being replaced, and it means we'll have to get a new small bar fridge. Why is it one thing always lead to another, and another and so on...
Happy Stitching,
Kerrie